Task List; Task 1: Unpacking; Packing List - Promise Technology FileCruiser VA2600 Hardware Installation Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

TASK LIST

The basic hardware installation tasks for the FileCruiser VA2600 described in the guide
are the following:
"TASK 1: UNPACKING" on page 5
"TASK 2: MOUNTING FILECRUISER IN A RACK" on page 7
"TASK 3: MANAGEMENT CONNECTION" on page 11
"TASK 4: CONNECTING THE POWER" on page 13
"TASK 5: CONFIGURE FILECRUISER" on page 18
Also included in this guide:
"WARRANTY" on page 19
"CONTACTING TECHNICAL SUPPORT" on page 20
For configuration instructions, please refer to the Quick Configuration Guide.

TASK 1: UNPACKING

PACKING LIST

The FileCruiser box contains the following items:
FileCruiser VA2600
Hardware Installation Guide printed
* These items might be an optional feature in your region. Please contact your sales
representative to learn whether this is included or an option for your FileCruiser
VA2600.
FileCruiser VA2600 Hardware Installation Guide
5
3 x 1.5 m (4.9 ft) Power cords
Sliding rail assembly for rack
mounting*
Front panel bezel cover*

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FileCruiser VA2600 and is the answer not in the manual?

Questions and answers

Table of Contents