Ironman Fitness H-CLASS 410 Owner's Manual page 13

Table of Contents

Advertisement

2.Front a
nd Rear St
tabilizer In
2.1 Front
Stabilizer
Installatio
Lift up the
e main fram
me (D) towa
the front c
curve of the
e Main Fram
ends of bo
olts with tw
o Flat Was
Stabilizer
(E) to the M
Main Frame
the two Sc
crews (I-1),
, two Flat W
2.2 Rear S
Stabilizer I
nstallation
Lift up the
e Main Fram
me (D) towa
the rear c
urve of the
Main Fram
ends of bo
olts with tw
o Flat Was
Stabilizer
(F) to the M
Main Frame
the two Sc
crews (I-1),
, two Flat W
secure.
Scr
rewdriver
I-1 Scre e w 4PCS
ASSEMBLY
stallation
n.
rds the fron
nt, and then
n align the F
me (D). At
ttach two C
Carriage Bo
hers (I-2) a
and two Aco
orn Nuts (I-3
e (D) and u
se the Box
Washers (I-2
2) and two A
Acorn Nuts(
n.
ards the en
d, and then
n align the R
me (D). Att
tach Two C
Carriage Bo
hers (I-2) a
and two Aco
orn Nuts (I-3
e (D) and u
se the Box
Washers (I-2
2) and two A
Acorn Nuts
I-2 Curved Wa
asher
8* 9*2T
T
4PCS
13
Front Stabil
lizer (E) ont
lts (I-1) and
d on the oth
3). Hold the
e Front
Spanner a
and Screwd
river to tigh
(I-3) until fir
rm and sec
Rear Stabil
izer (F) ont
lts (I-1) and
d on the oth
3). Hold the
e Rear
Spanner a
and Screwd
river to tigh
s (I-3) until f
firm and
Box
Spanner
I-3 Acorn Nut f
4PCS
to
her
hten
ure.
to
her
hten
for M8 Bolt t

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents