MTU 20V4000Lx2x Operating Instructions Manual page 145

Table of Contents

Advertisement

Measuring valve projection
1.
Check TDC position of piston in cylinder A1:
• If the rocker arms are unloaded on cylinder A1, the piston is in firing TDC.
• If the rocker arms are under load on cylinder A1, the piston is in overlap TDC.
2.
Measure valve projection for each valve in two crankshaft positions (firing TDC and overlap TDC for cylinder
A1) according to the diagram. Diagram (→ Page 148).
3.
Release adjusting screw (1) and remove valve
bridge. Do not remove rocker arm (2)!
4.
Measure distance between valve stem end
and cylinder head top at the spark plug bore
with depth gauge (see figure).
• The specified value for a new cylinder
head: 93.8 mm.
• Admissible wear: 3 mm.
• If the measured value is > 96.8 mm, re-
place the relevant cylinder head ahead of
schedule.
5.
Install valve bridge.
6.
Adjust valve clearance (→ Page 148).
Final steps
1.
Remove barring device (→ Page 131).
2.
Check condition of O-rings at the sleeves, replace if damaged.
MS150122/00E 2015-07 | Task Description | 145

Advertisement

Table of Contents
loading

Table of Contents