Install Water Piping - FULTON Reliance 500 Installation And Operation Manual

Table of Contents

Advertisement

INSTALLATION
!
WARNING
Ensure tank return line is not clogged.
Obstructions in the line could cause
damage to the pump seal.
The discharge from the safety relief valve
must be arranged to ensure no danger
of scalding personnel, or equipment
damage.
Provisions must be made to properly pipe
the safety relief discharge away from the
boiler to the point of discharge.
No shuto of any kind shall be placed
between the safety relief valve and
the boiler, or in the discharge pipe
between the valve and the atmosphere.
Doing so may cause an explosion from
overpressure.
The hydronic system should never be
ushed while the boiler is attached to the
system since the debris could accumulate
in the boiler and block water from passing
through the heat exchanger.
Ensure all labels on the boiler are legible.
All connections and safety devices, both
mechanical and electrical, must be kept
clean, with ease of access for inspection,
use and maintenance.
Do not store or use gasoline or other
ammable vapors and liquids or corrosive
materials in the vicinity of this or any other
appliances.
4
CAUTION
Low ow conditions will cause excessive
cycling, damage and failure of equipment.
Ensure water piping arrangements allow
for heat-up times at or below 30 seconds;
this will reduce condensation which may
contribute to equipment failure.
2-6

Install Water Piping

All water supplies contain some solids, dissolved gases or dissolved minerals.
These may promote corrosion, deposition and/or fouling of equipment. To
prevent these contaminants from impacting boiler performance, valve operation
and general pipe longevity, each location must be analyzed and treated
accordingly.
Adhere to the following for water piping installation (See Figure 3-5):
1. Boiler requires a minimum temperature di erential across the heat
exchanger at high re, and has a minimum ow requirement. Use Table 2
to identify ideal ow rates for the Reliance boiler.
TABLE 2 IDEAL FLOW RATES/GALLONS PER MINUTE*
RLN
500
750
Model
Min.
23
45
GPM
Max.
43
63
GPM
*The boiler warranty does not cover heat exchanger failure related to water ow rates outside
of these parameters. The minimum return water temperature must be greater than 140 F
(60 C) at all times to avoid condensation in the heat exchanger. Warranty does not cover heat
exchanger failure due to condensation of products of combustion.
2. Ensure piping arrangements allow for heat-up times at or below
30 seconds; this will reduce condensation which may contribute to
equipment failure.
3. Pipe unions and isolation valves are recommended on both water
connections for ease of service.
4. Install piping so that the boiler is not supporting any additional piping.
5. The top water connection on the back of the boiler is the hot water
outlet and must be connected as the supply to the system. The bottom
connection is the return/boiler inlet. See Figure 6.
6. Install a hot water circulator, remote mounted from boiler. Do not attach
directly to the boiler. Refer to Figures 3 - 5 for proper location of circulators.
7. Install manual purging valves in all loops and zones. Install a pressure
reducing (automatic ll) valve in the cold water ll line to the boiler system.
Check that the proposed operation of zone valves, zone circulator(s) and
diverting valves will not isolate air separator(s) and/ or expansion tank(s)
from the boiler. Clearance from hot water pipes to combustibles must be at
least 6 inch (152.4 mm).
8. The boiler, when used in conjunction with a refrigeration system, must
RLN-IOM-2012-1205
1000
1500
2000
45
75
90
83
130
150
© The Fulton Companies 2012
SECTION 2
2500
3000
130
140
200
210