IBM eServer 370 xSeries Installation Manual page 46

Hide thumbs Also See for eServer 370 xSeries:
Table of Contents

Advertisement

10. Ensure that the two processor cage release latches are still in the unlocked
11. Align the processor cage with its tabs over the corresponding slots on the
12. Firmly press the processor cage down into the slots in the processor housing
13. Squeeze and firmly push the release latches 1
14. Return to step 9 on page 30 to install the processors.
Processor-controller board jumpers
Table 7 on page 35 describes the jumper on the processor controller board.
Notes:
1. Be sure the processor bus-to-core ratio is set correctly (see Table 7 on
2. Be sure the processor-core-frequency-selection jumper block is set for the
3. If you plan to use the processor serial-number security feature, you must
34
xSeries 370 Installation Guide
(pulled out) position.
processor daughterboard. Match the labels on the processor cage with the
corresponding labels on the fan guard 9 ; for example, A1/A1.
assembly, until the processor cage is fully seated.
then, release.
Attention: Ensure that the release latches are in the fully locked position.
page 35). For example, if you have a 700 MHz processor installed and the
system bus speed is 100 MHz (the default), be sure that the jumpers are set to
a bus-to-core ratio of 7.0 (700/100).
slowest speed processor installed in your server. For example, if your server
has a 700 MHz processor installed and you install three 900 MHz processors,
make sure the processor-core-frequency-selection jumper block is set for the
700 MHz processor.
MHz denotes internal clock speed of the processor only; other factors also
affect application performance.
change the setting of the Processor Serial Number menu choice in the
Advanced Setup menu of the Configuration/Setup Utility program. The default
value is Disabled; change this value to Enabled.
back into the locked position;

Advertisement

Table of Contents
loading

Table of Contents