Embraer EMB-505 Phenom Service Manual page 58

Ground handling and servicing handbook
Table of Contents

Advertisement

7. Slowly fill the oxygen cylinder up to the recommended pressure.
NOTE: Slowly fill the system at a rate not greater than 1378.95
8. Monitor the pressure gauge of the aircraft and of the high pressure
oxygen servicing regulator.
9. Wait at least 10 minutes to let the temperature of the oxygen cylin-
der become stable.
10. Close the high pressure oxygen servicing regulator shutoff valve.
11. Carefully disconnect and remove the high pressure oxygen ser-
vicing regulator from the fill valve to release the remaining pres-
sure in the hose.
(b) Do a leak test on the fill valve.
1. Use fluid Leak-Tec 16-OX (Refer to Consumable Products Appen-
dix) on the connection to do the leak test. If there are leaks, replace
the fill valve.
(6) Do a check of the engine oil level (GHSH TASK 12-12-00-210-801-A/300).
(7) Do a check of the pressure of the MLG (Main Landing Gear) and NLG
(Nose Landing Gear) tires (GHSH TASK 32-45-00-210-801-A/600) and
(GHSH TASK 12-14-00-610-801-A/300).
(8) Do a check of the hydraulic system. If necessary, do the servicing. Please
use the contact information given in the GHSH Introduction for the applica-
ble maintenance action.
(9) Do a check to make sure that the primary control surfaces and the trim
tabs operate correctly. Please use the contact information given in the
GHSH Introduction for the applicable maintenance action.
(10) Do a check of the rain repellent coating. Please use the contact informa-
tion given in the GHSH Introduction for the applicable maintenance action.
(11) Make sure that there is no obstruction and foreigner objects in the NACA
air intakes of wing tanks.
(12) If the aircraft stayed parked for exactly 7 days, do this additional step:
(a) Drain the fuel tanks to check for presence of water (GHSH TASK 12-
11-00-680-801-A/300).
(13) To start the engines after normal parking in cold weather conditions, refer
to engine starting procedure (cold weather). Please contact Embraer Sup-
port for the applicable maintenance action.
EFFECTIVITY: ALL
Copyright © by EMBRAER S.A - All rights reserved - See title page for details.
kPa (200 psig) to prevent heating in the system and,
consequently, an incorrect pressure indication.
GROUND HANDLING AND
SERVICING HANDBOOK
10-30-00-500-802-A/200
Page 202
NOV 20/09

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Embraer EMB-505 Phenom

Table of Contents