Setting Front Linkage Lifting Link Positions - Valtra T144 Operator's Manual

T series
Table of Contents

Advertisement

If the implement follows the ground, use the floating position.
To activate the floating position, push the control lever past the extreme
position with increased force.
This locks the lever to the floating position
To deactivate the floating position, return the control lever manually to
the middle position.
IMPORTANT: Always use the floating position for implements following the
ground contour. Otherwise there is a risk that the implement may get
damaged or the traction of the wheels may be lost.
3.15.2

Setting front linkage lifting link positions

You can set the lifting links to different positions mechanically by changing the
positions of the fastening bolts.
IMPORTANT: When using the front loader, the front linkage lifting links must be
folded to the transport position.
GUID-631FF889-19C9-4135-895A-0B846D5BAC68
1. Fastening hole 1
2. Fastening hole 2
3. Fastening hole 3
1. Set the lifting links to the desired position and fit the fastening bolts to the
holes.
Lifting link position
Working
Transport
Floating
2. Secure the fastening bolts with locking pins.
CAUTION: When driving on public roads, with or without an
implement, always lift the front linkage fully up.
- 199 -
1
3
2
Fastening bolt location
Fastening bolts are fitted in holes 1 and 2 or 1 and 3.
Lifting links are folded fully up and fastening bolts are
fitted in holes 1 and 3.
Fastening bolt is fitted in hole 1 only.
NOTE: When using the mechanical floating position, the
maximum load on the ball hitch couplers is 25 kN.
3. Operation

Advertisement

Table of Contents
loading

Table of Contents