Eec Installation Instructions For Nonshielded Cables - DEC 3000 800 Owner's Manual

Table of Contents

Advertisement

EEC Installation Instructions for Nonshielded Cables

EEC Installation Instructions for Nonshielded Cables
Compliance
In order to comply with radio interference regulations in the
With EEC
European Economic Community (EEC), shielded data cables
must be used. To meet this requirement, users of nonshielded
Regulations
cables must ground the following ports, which use MMJ
connectors, by using a pigtail ground wire:
Attaching
To attach the pigtail grounding wire, complete the following
the Pigtail
steps and refer to Figure C–1.
Grounding Wire
1. Unscrew a TURBOchannel slot screw nearest to the port you
2. Align the hook of the pigtail grounding wire with the screw
3. Tighten the screw of the TURBOchannel slot until the
C–2 European Economic Community (EEC) Considerations
ISDN port (
in Figure C–1)
Alternate console/printer port (
are grounding.
hole.
grounding wire is secure.
in Figure C–1)

Advertisement

Table of Contents
loading

This manual is also suitable for:

3000 800s3000 900 axp

Table of Contents