Getting Started

Unpacking the Weighing Platform

Important Note
To install the weighing platform in a pit, please observe the special
requirements given in the section "Pit Installation."
Unpacking the Weighing Platform
− Remove the weighing platform and the load plate from the packaging
− To transport the weighing platform, lift it on both long sides
− Remove the plastic bags, packaging strips and foam material

Removing the Transport Locking Devices

Set up the weighing platform in the vicinity of your work area and remove the
load plate.
Proceed as follows with the red color-coded transport locking device:
− Remove screw 1
− Loosen screw 2 and turn the angular brace by 180°,
refasten screw 2
− Refasten screw 1 to the lever
Important Note on Transporting the Weighing Platform
Follow the above instructions in reverse order to replace the transporting
locking device when transporting the weighing platform.