Pit Installation Of The Weighing Platform - Sartorius IS 150 IGG-H Installation And Operating Instructions Manual

Weighing platforms
Table of Contents

Advertisement

16

Pit Installation of the Weighing Platform

Preparation
Choose the appropriate pit frame from the list of accessories.
Note to Users in the EU*
If necessary, the weighing platform can be installed into the pit prior to initial
verification. If a verified weighing platform has been installed, it must be
subsequently verified in compliance with the applicable regulations of your
country.
Depending on the size of your weighing platform, excavate the area where the
platform is to be installed according to the diagrams on the following page.
You must connect a drainage system (5) if the weighing platform will be
operated in a wet area. In this case, slope the floor of the pit (8) at a minimum
of 5% toward the drain point. Position a tube (6) with a min. diameter of
80 mm from a central point of the pit to the location of the display in order
route the signal cable. This will protect the cable, as required.
* including the Signatories of the Agreement on the European Economic Area
* in
cluding the Signatories of the Agreement on the European Economic Area
* in
* in
cluding the Signatories of the Agreement on the European Economic Area
cluding the Signatories of the Agreement on the European Economic Area

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Is 300igg-h0ceIs 150 igg-h0ceIs 300 igg-h

Table of Contents