SMC Networks HRZD020-WS-WS Operation Manual page 38

Thermo chiller
Table of Contents

Advertisement

HRX-OM-M005
Chapter 3 Transporting and Installation
Procedure for piping installation
Recommended piping installation
CH1 circulating fluid
supply
CH1 circulating fluid
return
CH2 circulating fluid
supply
CH2 circulating fluid
return
Facility water outlet
Facility water inlet
No.
1
2
3
4
3.3 Procedure for Installation
3-14
Secure the pipe coupling section with a pipe wrench, and provide proper tightening
to the pipe.
Figure 3-10 Pipe Tightening
Figure 3-11 Recommended Piping Installation
Table 3-4 Recommended Pipe
Name
Valve
Y-strainer (100μm)
Valve
Y-strainer (5μm)
Pipe coupling section
Size
Material
Rc3/4
Stainless steel
Rc3/4
Stainless steel
Rc1/2
Stainless steel
Rc1/2
Stainless steel
System on the
customer side
HRZD Series

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hrzd020-ws-w1sHrzd020-w1s-w1sHrzd020-w1s-ws

Table of Contents