Installation checklist

The installation checklist in
copy of this checklist and mark the entries as you complete each task. For each SmartNode 1000 or 2000
series, include a copy of the completed checklist in your site log.
Network information available & recorded in site log
Environmental specifications verified
Site power voltages verified
Installation site pre-power check completed
Required tools available
Additional equipment available
All printed documents available
SmartWare release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Cable length limits verified
Initial configuration performed
Initial operation verified

Site Log

Patton recommends that you maintain a site log to record all actions relevant to the system, if you do not
already keep such a log. Site log entries might include information as listed in
Entry
Installation
Upgrades and maintenance
Configuration changes
Maintenance
Comments
Software

Installation checklist

table 19
lists the tasks for installing a SmartNode 1000 or 2000 series. Make a
Table 19. Installation checklist
Task
Table 20. Site log entries
Description
Make a copy of the installation checklist and insert it into the site log
Use the site log to record ongoing maintenance and expansion history
Record all changes and the reasons for them
Schedules, requirements, and procedures performed
Notes, and problems
Changes and updates to SmartWare software
3 • Planning the installation
Verified by
Date
table
20.