Next, install lower Left Seat Rail[2].
Left Seat Rail
M10x70mm bolt for E-520 (M10x80mm
bolt for VX-3)[12], Nylock nut[16] and
M10 washers[15].
Before installation of the Right Seat Rail,
Bungee Shock Cord
thread the Bungee Shock Cord through
Right Seat Rail
the top of the Seat Rail, around the
Bungee Pulley and out the bottom as
shown.
Bungee Pulley
Once this is complete, repeat the same
assembly procedure as used on the Left
Seat Rail.
9