Maintenance Chart - First Degree Fitness E-520 Fluid Rower Owner's Manual

Hide thumbs Also See for E-520 Fluid Rower:
Table of Contents

Advertisement

Maintenance Chart

Item
Seat and Seat
Rails.
Frame.
Tank and Water
Treatment.
Bungee Cord.
Rowing Belt.
Timeframe
Weekly.
Weekly.
12 months to 2
years.
Check every hundred
hours for correct ten-
sion and for signs of
wear.
Check every hundred
hours for correct ten-
sion and for signs of
wear.
Instructions
Wipe seat rails with a clean,
dry cloth. Lightly spray the in-
side of rails with silicone spray.
Wipe down with lint free cloth.
Follow instructions as specified
in the "Water Treatment" sec-
tion of this manual.
The Bungee Cord should last
for many years. If a bungee
cord change is required,
please follow the instructions
provided in the "Changing the
Bungee Cord" section of this
manual.
The Rowing Belt should pro-
vide many years of trouble free
use. If a rowing belt change is
required, please contact your
local service representative or
go online at
www.firstdegreefitness.com
further details.
20
Notes
for

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vx-3 fluid rower

Table of Contents