Section 8 − Pre-Power Troubleshooting; Checking Unit Before Applying Power - Miller Millermatic 350P Technical Manual

Arc welding power source and wire feeder
Hide thumbs Also See for Millermatic 350P:
Table of Contents

Advertisement

SECTION 8 − PRE-POWER TROUBLESHOOTING

8-1. Checking Unit Before Applying Power

!
Discharge input capacitors according to Section 8-2 and be sure voltage is near zero before touching any parts.
!
Before troubleshooting or applying power to unit, complete following checks to avoid causing further damage.
!
Although control board PC1 and hall device HD1 are briefly checked in this procedure, more complete tests may be needed later
for these parts. This check is simply to get a basic okay to power up unit.
.
The pre-power checklist should be followed if any of the following conditions exist:
the unit is completely inoperative;
the symptoms are unknown;
visual damage is found on any of the following components: capacitors C3 and C4, control board PC1, IGBT power modules PM1 and PM2, inter-
connecting board PC2, or input rectifier SR1;
there is no output or limited output.
TM-1327 Page 42
.
See Section 9-3 for test points and values and Section
12 for parts location.
Millermatic 350

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Millermatic 350

Table of Contents