Dedicated Ilo Port Management Module - HP ProLiant ML110 Gen9 Maintenance And Service Manual

Hide thumbs Also See for ProLiant ML110 Gen9:
Table of Contents

Advertisement

Remove the battery.
9.
IMPORTANT:
configuration. After replacing the battery, reconfigure the system through RBSU.
To replace the component, reverse the removal procedure.
For more information about battery replacement or proper disposal, contact an authorized reseller or an
authorized service provider.

Dedicated iLO port management module

To remove the component:
Power down the server (on page 25).
1.
Remove all power:
2.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Place the server on its side.
3.
Remove the access panel (on page 25).
4.
If installed, remove the PCI air baffle (on page 27).
5.
Remove the system air baffle (on page 28).
6.
Replacing the system board battery resets the system ROM to its default
Removal and replacement procedures 59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents