Unit Assembly Prior To Installation; Nailing Strips; Installation Access Panel - Regency Horizon HZ30E-NG10 Owners & Installation Manual

Horizon hz30e series gas fireplace
Hide thumbs Also See for Horizon HZ30E-NG10:
Table of Contents

Advertisement

installation
|
12
UNIT ASSEMBLY
PRIOR TO
INSTALLATION
The nailing Strips must be correctly positioned and attached before unit is
slid into position.

NAILING STRIPS

The nailing strips come attached to the unit. There is 1 plate on each side and
one on the bottom that can be folded out as required.
The side nailing strips are secured to the framing. The bottom
nailing strip is secured to the unfinished floor - if installing the unit directly
on the floor.
IMPORTANT NOTE
Framing depth measurement is noted with
the nailing strips set as far forward on the
firebox as possible. The nailing strips can
be adjusted back up to 3-1/8" to allow for
varying thicknesses in non-combustible
material & wall finishes.

INSTALLATION ACCESS PANEL

The unit is equipped with a removable access panel for pre-finish installation
of optional components - this panel is located on the lower front face.
1. Remove 2 screws to remove access panel.
2. Easier access to gas connection with panel removed.
3. Install any optional components with access panel removed.
4. Reinstall access panel with 2 screws - prior to installing any facing material
Note: Access panel is no longer usable once facing material installed.
12 |
Regency Horizon HZ30E-10 Gas Fireplace
Screw Locations
Installation Access Panel
Nailing Strips

Advertisement

Table of Contents
loading

This manual is also suitable for:

Horizon hz30e-lp10Horizon hz30e

Table of Contents