Foot Box Front Wall, Top Panel, And Tunnel Cover Aluminum - Factory Five Racing GTM Supercar Assembly Manual

Table of Contents

Advertisement

Foot Box Front Wall, Top Panel, and Tunnel Cover Aluminum

Eye protection, drill w/#6 hex nut driver, ⅛" drill bits, drill, rivet gun, silicone, caulking gun, #6
self tapping screws.
GTM foot box aluminum (FFR# 25171).
Install the front footbox wall (FFR# 25190). Do not rivet the upper edge yet, as it is riveted in the next
step.
437
www.factoryfive.com
508-291-3443

Advertisement

Table of Contents
loading

Table of Contents