Replacing Sub-Tank Assembly - MUTOH ValueJet 1604 Service Manual

Mutoh valuejet 1604 service manual
Table of Contents

Advertisement

VJ-1604   Maintenance Manual
No.
3. Pull out the absorber mounting plate.
4. Replace the sub-tank lower absorber assembly.
The sub-tank lower absorber is accompanied when removing the absorber mounting plate. They are
collectively called sub-tank lower absorber assembly.
5. To reassemble the unit, reverse the removal procedure.

4.10.8 Replacing Sub-Tank Assembly

1. Perform ink discharge operation to discharge ink entirely from the ink paths.
"5.7.8 HeadWash Menu" p.5-43
2. Remove the two-way valve fixture plate.
"4.10.5 Replacing Two-Way Valve NX" p.4-141
3. Remove the absorber mounting plate.
"4.10.7 Replacing Sub-Tank Lower Absorber Assembly" p.4-144
4. Move the carriage to the opposite side of the origin.
"4.8.1 Releasing Head Lock" p.4-106
5. Remove the intake tubes (2 pieces) from the joint screws (2 pieces).
1
Front view
2
No.
3
Screws that retain the absorber mounting plate
(pan-head screw with spring washer and flat washer M3
6)
3
1
Joint screw
2
Ink tube
3
Sub tank assembly
Part name
3
1
Part name
4-147
4 Parts Replacement
×
Rear view
Rev.-05
4
2

Advertisement

Table of Contents
loading

Table of Contents