AT&T SB67010 PSTN Installation Manual page 66

Hide thumbs Also See for SB67010 PSTN:
Table of Contents

Advertisement

Synapse Installation Guide
If the upgrade process is interrupted by removing the server connection, no
restart occurs. The Gateway remains on the xx% complete screen, until an action
is taken at that Gateway. The process does not resume even after the server
connection is reestablished.
Pressing
midstream and returns you to the Configuration menu. The previous software
version remains in effect.
When the upgrade is complete, the screen briefly displays 100% complete,
then 0% complete for few seconds, before restarting the Gateway.
4. Press
Getting Started
during the programming process terminates the download
repeatedly until you return to the Gateway main menu.
65
Back to Contents

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sb67060 t1Sb67070 sipSb67020Sb67025Sb67080Synapse

Table of Contents