Scope Of Delivery; Moving The Boiler; Moving The Boiler With Boiler Cart - Buderus Logano GC 124 II Installation And Service Instructions Manual

Gas boiler
Hide thumbs Also See for Logano GC 124 II:
Table of Contents

Advertisement

4

Scope of delivery

4
Scope of delivery
▶ Check packaging upon receipt of delivery for damage.
▶ Check delivery for completeness.
Component
Qty
Boiler, complete
1
B-kit components:
1
• 1-1/4" supply
manifold
• 30 psi relief valve
• long shank boiler
drain (¾")
• ¼" pressure/
temperature gauge
• 90°-elbow
(1¼" x 1" NPT)
• 90°-elbow
(1¼" x 1¼" NPT)
• 90°-elbow (¾" NPT
nipple)
• nipple1" NPT
• nipple 1¼" NPT
Vent damper
1
Circulator with whip
1
Technical documents
Table 4 Scope of delivery
1) On Palette
Accessory
Cleaning Brush
Table 5 Scope of delivery
5

Moving the boiler

This chapter describes how to move the boiler safely into place.
NOTICE: System damage due to uneven and rough
surfaces.
▶ Observe the transport diagrams on the packaging to
protect the sensitive components from damage due
to rough surfaces. Handle the product with care.
Protect all boiler connections from dirt if the boiler is not
installed immediately following removal from packaging.
Dispose of the packaging material in an environmentally
prudent fashion.
6
Packaging method
1 palette
1)
1 cardboard box
1)
1 cardboard box
1)
1 cardboard box
1 plastic package
Qty
1
5.1

Moving the boiler with boiler cart

Move the boiler with packaging in tact and on its pallet as much as
possible.
▶ Remove packaging straps and cardboard box from pallet.
▶ Remove screws that secure the boiler base to the wood pallet.
▶ Pick up boiler base from one side and slide to the edge of the pallet.
Place a steel pipe as roller under the boiler base. Place additional steel
pipes under the boiler base and roll the boiler to its final destination.
Fig. 4 Moving the boiler with rollers
CAUTION: Risk of injury due to improper securing of the
boiler during transport.
▶ Use a boiler coart or dolley and strap for moving the
boiler
▶ Secure boiler on the boiler cart.
▶ Remove the front door during lifting or transport to
prevent unintentional opening.
▶ Set the boiler cart or dolley on the front side of the boiler and put a
piece of cardboard between the two to prevent scratches.
Fig. 5 Moving the boiler with dolley or boiler cart.
[1]
Additional card board for protection.
Logano GC 124 II – 6 720 804 440 (2012/11)
6 720 804 440-04.1T
1
6 720 804 440-05.1T

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Loganous gc 144 iiLoganoca gc 144 ii

Table of Contents