Removing The 2.5-Inch Hdd/Ssd Module - Fujitsu PRIMERGY BX920 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX920 S3:
Table of Contents

Advertisement

V
CAUTION!
All data on all HDDs/SSDs in the array will be lost! Be sure to back up
your data before deleting a RAID array.
I
For further information, please refer to the "ServerView Suite RAID
Management" user guide, available online at
http://manuals.ts.fujitsu.com
supplied with your PRIMERGY server.
"Opening the rack door" on page 54
Ê
6.3.3

Removing the 2.5-inch HDD/SSD module

Figure 20: Unlocking the 2.5-inch HDD/SSD module
Ê Release the locking mechanism as follows:
1. Press the two green tabs of the locking lever together (1).
2. Push the handle of the HDD/SSD module fully in the direction of the
arrow (2). The HDD/SSD module is now unlocked.
Ê Pull the HDD/SSD module out a few centimeters.
Ê Wait for at least 30 seconds.
I
This period is necessary for the RAID controller to recognize that an
HDD/SSD module has been removed and for the hard disk drive to
come to a stop.
BX920 S3
or from the ServerView Suite DVD 2
Upgrade and Maintenance Manual
Hard disk drives / solid state drives
109

Advertisement

Table of Contents
loading

Table of Contents