Removing The Tpm; Required Tools - Fujitsu PRIMERGY BX920 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX920 S3:
Table of Contents

Advertisement

System board components

10.3.2 Removing the TPM

Field Replaceable Units (FRU)
Average task duration: 30 minutes
V
CAUTION!
Advise your contact persons that they must provide you with TPM
backup copies. For security reasons, the TPM must be restored/re-
saved by the customer. After installing a new system board, the TPM
must be enabled. You may not clear the TPM data.
If the contact persons DO NOT have a backup copy available, inform
them that replacing the TPM will cause to lose all data.

10.3.2.1 Required tools

Preliminary and concluding steps: tool-less
Removing the system board:
– Phillips PH2 / (+) No. 2 screw driver
Removing the TPM:
– thin slotted screw driver (
For the Japanese market:
– Dedicated TPM screw driver (CWZ8291A)
232
2 x 0.4 mm)
Upgrade and Maintenance Manual
BX920 S3

Advertisement

Table of Contents
loading

Table of Contents