Concluding Steps - Fujitsu PRIMERGY BX920 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX920 S3:
Table of Contents

Advertisement

10.5.5 Concluding steps

Ê If applicable, reinstall the air cowls as described in section
cowls" on page
Ê Reinstall all remaining system board components as shown in the related
sections:
– Heat sinks: refer to section
– Memory modules: refer to section
page 173
I
Install all memory modules into their original slots.
– Mezzanine cards: refer to section
page 130
I
Install all mezzanine cards into their original slots.
– SAS RAID HDD module: refer to section
module" on page 144
– UFM: refer to section
– TPM (if applicable): refer to section
page 227
Ê Close the server blade as described in section
page
59.
Use the cover from the defective server blade because the COA label is
stuck there.
Ê Reinstall the HDD/SSD modules in their original mounting bays as described
in section
"Installing a 2.5-inch HDD/SSD module" on page
Ê Reinstall and secure the server blade in the system unit as described in
section
"Installing the server blade in the system unit" on page
Ê If applicable, close the rack door as described in section
door" on page
Ê Update the system board BIOS and iRMC to the latest version as described
in section
"Updating or recovering the system board BIOS and iRMC" on
page
77.
BX920 S3
181.
"Installing processor heat sinks" on page 202
"Installing the UFM" on page 216
65.
Upgrade and Maintenance Manual
System board components
"Installing a memory module" on
"Installing mezzanine cards" on
"Installing the SAS RAID HDD
section "Installing the TPM" on
"Closing the server blade" on
"Installing the air
104.
60.
"Closing the rack
249

Advertisement

Table of Contents
loading

Table of Contents