Removing A 2.5-Inch Hdd/Ssd Module - Fujitsu PRIMERGY TX1320 M4 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX1320 M4:
Table of Contents

Advertisement

In order to permanently remove an operational HDD/SSD module that is part
of a RAID array from the server, you first need to delete the array using
ServerView RAID Manager.
V
CAUTION!
All data on all HDDs/SSDs in the array will be lost when deleting the
RAID array! Be sure to back up your data before deleting a RAID
array.
For more information, see the "ServerView Suite RAID Management"
user guide.
"Getting access to the component" on page 51
Ê
7.4.5.2

Removing a 2.5-inch HDD/SSD module

Ê Pinch the green locking clips and open the locking lever (see figure 61).
Ê Pull the HDD/SSD module out a few centimeters.
Ê Wait about 30 seconds to allow the HDD to spin down.
I
This is not necessary when removing an SSD.
I
This period is necessary for the RAID controller to recognize that an
HDD module has been removed and for the HDD to come to a stop.
Ê Pull the HDD/SSD module completely out of its bay.
TX1320 M4
Hard disk drives (HDD) and solid state drives (SSD)
Upgrade and Maintenance Manual
147

Advertisement

Table of Contents
loading

Table of Contents