Concluding Steps; Removing A 2.5-Inch Hdd/Ssd Module; Required Tools; Preliminary Steps - Fujitsu PRIMERGY BX920 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX920 S3:
Table of Contents

Advertisement

Hard disk drives / solid state drives
6.2.5

Concluding steps

Perform the following procedures:
"Closing the rack door" on page 65
Ê
Ê If applicable, please observe the notes on RAID rebuild in section
"Performing a RAID array rebuild" on page 97
6.3

Removing a 2.5-inch HDD/SSD module

Customer Replaceable Units (CRU)
Average task duration: 5 minutes
V
Only applicable for removing non-defective HDD/SSD modules:
Ê Set the drive to "Offline" via the software (RAID controller
configuration software), before removing an HDD/SSD module that is
not defective.
6.3.1

Required tools

Preliminary and concluding steps: tool-less
Main steps: tool-less
6.3.2

Preliminary steps

Perform the following procedures:
Ê Only applicable for removing intact HDD/SSD modules (for example:
preventive exchange in case of S.M.A.R.T):
Ensure that the HDD/SSD module to be removed is not combined into a
RAID array. If the drive is part of a RAID array, you first need to delete the
array using ServerView RAID Manager.
108
Upgrade and Maintenance Manual
BX920 S3