Concluding Steps - Fujitsu PRIMERGY BX920 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX920 S3:
Table of Contents

Advertisement

Processors
9.2.4

Concluding steps

Perform the following procedures to complete the task:
Ê Install the processor heat sink onto the processor as described in section
"Installing processor heat sinks" on page
Ê Close the server blade as described in section
page
59.
Ê Reinstall and secure the server blade in the system unit as described in
section
"Installing the server blade in the system unit" on page
Ê If applicable, close the rack door as described in section
door" on page
Ê If available, update the system board BIOS and the iRMC to the latest
version as described in section
BIOS and iRMC" on page
Ê Enable boot watchdog functionality as described in section
watchdog functionality" on page
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page
Ê Enable the replaced processor as described in section
components in the system BIOS" on page
190
65.
"Updating or recovering the system board
77.
96.
Upgrade and Maintenance Manual
202.
"Closing the server blade" on
89.
90.
60.
"Closing the rack
"Enabling boot
"Enabling
"Enabling replaced
BX920 S3

Advertisement

Table of Contents
loading

Table of Contents