11. Install the top cover.
See
"Install the Top Cover" on page
12. Slide the server into the rack.
See
"Return the Server to the Normal Rack Position" on page
13. Connect the power supplies.
See
"Connect Power Cords to the Server" on page
Note – As soon as the power cords are connected, standby power is applied.
Depending on how the firmware is configured, the system might boot at this time.
14. Power on the server.
See
"Power On the Server Using the poweron Command" on page 181
On the Server Using the Front Panel Power Button" on page
15. Perform the following steps to verify that there are no faults:
a. Set the virtual keyswitch to diag so that POST will run in Service mode.
-> set /SYS/keyswitch_state=Diag
Set 'keyswitch_state' to 'Diag'
b. Power cycle the system.
-> stop /SYS
Are you sure you want to stop /SYS (y/n)? y
Stopping /SYS
-> start /SYS
Are you sure you want to start /SYS (y/n)? y
Starting /SYS
Note – The server takes about one minute to power off. The ILOM console does not
indicate when the system is actually powered off.
177.
181.
Servicing Motherboard Components
180.
or
"Power
182.
93