Download Print this page

Site Preparation; Checklists - NETGEAR RT210 Reference Manual

Isdn routers

Advertisement

Reference Guide for the Model RT210/RT211 ISDN Routers
9-pin D-connector to 25-pin D-connector adapter
RJ-45 two-way splitter
This guide
Getting Started Using FirstGear
Two 3.5-inch FirstGear installation diskettes
Four rubber feet
Four Velcro feet
Two Velcro pads
Warranty/Registration card
Call your dealer if there are any wrong, missing, or damaged parts. Keep the carton, including the
original packing materials, to repack the router if there is a need to return it for repair.

Site Preparation

Before you begin installing the router, prepare the installation site. Make sure the operating
environment meets the physical requirements of the router. The ambient temperature must be
between 0 C and 40 C. The maximum relative humidity must not exceed 90%.
The router should be installed on a flat surface in a clean, dry location. You should ensure that all
units to be connected are within reach of the cables and power and that all are functioning
correctly.

Checklists

Check the following ISDN Service Checklist and Network Checklist to make sure that all
requirements are met and that your network is properly configured.
2-2
Installing and Connecting

Advertisement

loading

This manual is also suitable for:

Rt211