Installation Overview; Recommended Installation Procedure - FireplaceXtrordinair 44 DV XXL EF Manual

Built-in direct vent fireplace
Hide thumbs Also See for 44 DV XXL EF:
Table of Contents

Advertisement

8

Installation Overview

See "Power Heat
Vent" in the optional
equipment section.
3-1/2" Min.
Drywall
Non-combustible facing
(see the section "Facing
Requirements")
See the section
"Mantel Requirements"
See the section
"Hearth Requirements"

Recommended Installation Procedure

1
Frame the opening for the fireplace. Make sure to allow for vent installation and the type of installation (corner
or flat wall).
2
Insert the fireplace into the framing. Slide it back until the firebox front face is flush with the framing members.
Verify all clearances at this point.
3
Secure the fireplace to the floor by screwing or nailing through the nail-down plates (found on both sides and
back of the fireplace).
4
Complete the gas line installation.
5
Complete the electrical hook-up.
6
Complete the vent installation.
7
Install the hearth (if applicable).
8
Install the facing.
9
Install the mantel (if applicable).
8
Travis Industries
Installation
See the section "Fireplace
Placement Requirements"
(for qualified installers only)
See the section
"Vent Requirements"
Nail
Down
Plate
See the section
"Gas Line Installation"
4050114
See the section "Horizontal Termination
Requirements"
See the section "Acceptable
Vent Lengths"
Insulation must not fill the 1"
clearance around the back and sides
of the fireplace.
See the section
"Electrical Connection"
This grommet and hole is for
thermostat wire (on both sides)
See the section "Minimum
Framing Dimensions"
1 0 0 - 0 1 1 4 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents