FireplaceXtrordinair 44 DV XXL EF Manual page 51

Built-in direct vent fireplace
Hide thumbs Also See for 44 DV XXL EF:
Table of Contents

Advertisement

Optional Equipment
2
Attach the blower box to the framing or floorboards of the home following the instructions below.
Wall or Ceiling Mounting
Cut a hole between wall
a
framing members for the
blower assembly.
5-1/4"
* This blower was designed for framing on 16"
centers - construct additional framing if needed.
Floor Mounting
Cut a hole between floor joists
a
for the blower box.
c
Travis Industries
16"*
5-1/4"
14"
Slide the blower into the hole
cut in step "a". Attach with four
screws.
(for qualified installers only)
Attach the wall mounting
b
brackets to the blower box.
Mount the bracket to
these holes for 2 x 4 walls
Mount the bracket to
these holes for 2 x 6 walls
Attach the floor boot to the blower box with the included screws.
b
4050114
Slide the blower, with
c
wires, into the hole cut
in step "a". Attach
with four screws.
The screws
attach to either
of these pairs of
holes. Use the
upper pair for
thick flooring, the
lower pair for
thin flooring.
1 0 0 - 0 1 1 4 9
5 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents