Taking Inventory

Before you work with the analyzer, check the delivery to ensure that it is compete, using
the following list and the delivery specifications:
1 Power Analyzer
1 Operators Manual
1 mains (power) cable
1 calibration certificate
1 built-in printer (if ordered)
1 to 6 voltage and current channel modules, according to the delivery
specifications

Installation and Switching On

Installation

To avoid possible electric shock or personal injury:
The device is connected to the power mains with a number
of internal components live with dangerous voltage levels.
The device must be equipped with a low-resistance
connection to earth ground.
Carefully check the mains socket and its wiring.
To install:
1. Follow the safety instructions regarding ambient conditions and location of
installation.
2. Place the device on a clean and stable surface.
3. If necessary, adjust the feet at the base of the unit to improve the view of the
display.

Switching Device On

To turn the Analyzer on:
1. Connect the Analyzer to the power (mains) socket, using the power cable.
2. Set the power switch on the back of the housing to I (on). The Analyzer is now
ready for operation. The following start screen displays.
XW Warning
4
Startup
Taking Inventory
4-3