Preparing The Cables; Installing The Power Supply - Extreme Networks Summit X150 Series Hardware Installation Manual

Summit x150 series summit x250e series summit x350 series summit x450 series summit x450a series summit x450e series summit x460 series summit x480 series summit x650 series
Hide thumbs Also See for Summit X150 Series:
Table of Contents

Advertisement

Installing Summit Family Switches

Preparing the Cables

A ring terminal and two spade terminals are provided with the PSU. You need a crimping tool to attach
the terminals to the power and ground cables.
To prepare the cables:
1 On each wire, strip 0.25 inch of insulation from one end.
2 Insert the stripped wire end all the way into the barrel of the terminal
terminal securely to the wire.
Figure 175: Attaching Terminals to Cables
Power connection

Installing the Power Supply

CAUTION
The handle on the Summit X650 DC PSU is not designed to be used to lift or carry the Summit X650
series switch.
To install a Summit X650 DC PSU:
1 If necessary, remove a blank panel from the back of the Summit X650 series switch
Figure 176: Removing a Blank Panel
212
Ground wire
SH_109
SH_106
Summit Family Switches Hardware Installation Guide
(Figure
175) and crimp the
(Figure
176).
SH_110

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents