Chapter 4: Site Preparation - Extreme Networks Summit X150 Series Hardware Installation Manual

Summit x150 series summit x250e series summit x350 series summit x450 series summit x450a series summit x450e series summit x460 series summit x480 series summit x650 series
Hide thumbs Also See for Summit X150 Series:
Table of Contents

Advertisement

4
C H A P T E R
This chapter includes the following sections:
Planning Your Site on page 120
Meeting Site Requirements on page 120
Evaluating and Meeting Cable Requirements on page 125
Meeting Power Requirements on page 130
Applicable Industry Standards on page 132
By carefully planning your site, you can maximize the performance of your existing network and ensure
that it is ready to migrate to future networking technologies.
The information in this chapter is intended for the system administrator, network equipment technician,
network manager, or facilities manager responsible for installing and managing the network hardware.
The chapter assumes a working knowledge of local area network (LAN) operations, and a familiarity
with communications protocols that are used on interconnected LANs.
Only qualified service personnel should install, maintain, or remove a switch, chassis, or its
components. Qualified service personnel have had appropriate technical training and experience that is
necessary to be aware of the hazards to which they are exposed when performing a task and of
measures to minimize the danger to themselves or other people.
NOTE
Before installing or removing any components of the system, or before carrying out any maintenance
procedures, read the safety information in
Summit Family Switches Hardware Installation Guide
Site Preparation
Appendix A
of this guide.
119

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents