Note:
Figure 21: Preparing the rear rack columns
Prepare the Switch for Installation
The following section describes how to install the mounting hardware that
attaches the switch to the rails. This hardware includes:
Use these steps to secure the mounting hardware to the switch, as shown in
Figure
1. Locate the two front mounting brackets in the shipping carton.
2. Position the front mounting bracket (5) so that the bracket's angled side faces
Director 2/64 Installation Guide
Two sheet metal nuts should be on each back column face (3).
Two front mounting brackets
Two rear mounting plates
Eight 10-32, flat-head Phillips screws
22:
out and is on the upper part of switch side.
Installing and Configuring the Director 2/64
63