Installing and Configuring the Director 2/64

Prepare the Front and Rear Rack Columns

Use the following procedure to prepare the rack for installing a switch:
1. Prepare the front rack columns, as shown in
Note:
Figure 20: Preparing the front rack columns
2. Prepare the rear rack columns, as shown in
62
a. Standing at the front of the rack, count up from the top of the rail tray (1)
to the 13th, 19th, and 23rd holes on the rack's front face.
b. Slide a sheet metal nut (2) on each of the located holes.
Three sheet metal nuts should be on each front column face (3).
a. Standing at the back of the rack, count up from the top of the rail tray (1)
to 12th and 28th on the rack's back face.
b. Slide a sheet metal nut (2) on each of the located holes.