Installing and Configuring the Director 2/64
Figure 13: Securing the rear angle brackets
7. Using a torque driver, torque the screws to 22 in/lb.
8. Connect the remaining ends of the PDU power cords to separate PDUs (if
Note:
Hewlett-Packard ships two PDU power cords with the Director 2/64.
56
installed), as shown in
power cords.
Hewlett-Packard recommends installing an optional PDU in the rack.
WARNING:
Hewlett-Packard power cords are provided for each director
power supply. To prevent personal injury by electric shock, use only the
supplied power cords. Also, verify that the facility power receptacle is the
correct type, supplies the required voltage, and is properly grounded.
Figure
14; otherwise, connect the two standard AC
Director 2/64 Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storageworks director 2/64

Table of Contents