Installing and Configuring the Director 2/64
.
1
2
Figure 54: Connect the Fibre Channel cables
2. Connect device cables to ports and route the cables through the cable
3. Bundle Fibre Channel cables from the director and other equipment (groups
4. Set the director online. For instructions, see
Connect the Director to a Fabric
To attach the director to a multi-switch fabric, connect the director to an E_Port of
another director or switch. The E_Port to E_Port connection is referred to as an
ISL.
112
Director 2/64
Fibre Channel cables
management assembly at the bottom front of the director. Start with the center
UPM cards (cards 7 and 8) adjacent to the CTP2 cards and work outward. In
addition, start with the bottom port of each UPM card and work upward.
of 16 maximum) and secure them as directed by the customer.
page 87.
Workstation
3
"Set the Director
Director 2/64 Installation Guide
Online" on