Major System Components; General; Factory-Installed Components - Carrier WEATHERMAKER 48J Started Manual

Single package large rooftop units with comfortlink ti version 5.x controls sizes (020-060)
Table of Contents

Advertisement

T705 (Limit Switch Thermistor
Failure) -- A failure (the sen-
sor is outside the range of-40
F to 240 F) of this thermistor
(Temperatures--)AIR.
T--+S.GLM)
will cause an alert to occur
and a disabling of the limit switch monitoring
function for the
staged
gas
control
board
(SCB).
Recovery
is automatic.
Reason
for failure
may be due to faulty wiring,
a faulty
thermistor, or a damaged input on the staged gas control board
(SCB).
MAJOR
SYSTEM
COMPONENTS
General
--
The 48/50A
Series package
rooftop units with
electric
cooling and with gas heating
(48A units) or electric
cooling
and
electric
heating
(50A
units)
contain
the
(_l_fortLink
TM
electronic
control
system
that monitors
all
operations
of the rooftop. The control system is composed
of
several components
as listed below. See Fig. 15-23 for typical
control and power component
schematics.
Figures 24 and 25
show the layout of the control box, unit, and thermistor
and
transducer
locations.
Factory-Installed
Components
MAIN BASE BOARD
(MBB) -- See Fig 26 The MBB
is
the center of the (_l_fortLink
control system. The MBB con-
tains the major portion of the operating
software and controls
the operation
of the unit. The MBB has 22 inputs and 11 out-
puts. See Table 115 for the inputs and output assigmnents.
The
MBB
also continuously
monitors
additional
data from the
optional
ECB1,
ECB2,
SCB, and CEM
boards through
the
LEN colmnunications
port. The MBB also interfaces with the
Carrier Comfort Network :R: s ystem through the CCN colmnuni-
cations port. The board is located in the main control box.
ECONOMIZER
BOARD
(ECB 1) -- The ECB 1 controls the
economizer
actuator
and the power exhaust
fans. The ECB1
operates the economizer
motor using a digital cognnunication
signal that also provides
stares and diagnostics
for the econo-
mizer motor. See Fig. 27. The ECB1 also controls the operation
of the power exhaust motors and provides up to 6 stages of dig-
itally sequenced power exhaust either based on the economizer
motor position or the building pressure. The board has 4 inputs
and 6 outputs. Additionally,
ECB1 provides
an output that will
send a 4 to 20 mA signal to a field-installed
VFD power ex-
haust accessory.
Details can be found in Table 116. The ECB1
board is located in an auxiliary
box located at the end of the
unit behind
the filter
access door. The board also contains
a second
LEN
port than can be used with
the accessory
Navigator
TM
display.
VAV BOARD
(ECB2) -- The VAV board (which is the same
hardware
as the ECB1)
is used to control the supply
fan on
VAV units. See Fig. 27. It sends a 4 to 20 mA signal to the VFD
based on a supply duct pressure sensor connected
to the board.
The board also accepts a signal from another pressure
sensor
that monitors
building pressure
and controls the operation
of
the optional modulating
power exhaust motors. The board will
also be used on CV units with the optional
building pressure
control feature and modulating
power exhaust. This board is
also used to control a digitally controlled
hot gas bypass sole-
noid with an integral orifice for use in low load applications.
This board is located in the auxiliary
control box. Input and
output assigmnents
are sulmnarized
in Table 117.
STAGED
GAS HEAT BOARD
(SCB)
--
When
optional
staged gas heat is used on CV and VAV units, the SCB board is
installed and controls operation of the gas valves. See Fig. 28.
The SCB also provides
additional sensors for monitoring
of the
supply-air
temperature.
This board is located in the gas heat
section of the unit. The inputs and outputs are smrnnarized
in
Table 118.
CONTROL
EXPANSION
MODULE
(CEM) -- The optional
CEM (also available as an accessory)
is used to accept inputs
for additional
sensors or control sequence
switches, including:
smoke control mode field switches
VAV Supply Air Temperature
Set Point reset using an exter-
nal 4 to 20 mA signal
outdoor air CO 2 sensor (for supply duct pressure reset using
an eternal 4 to 20 mA signal)
external fan status pressure switch input (CV units)
demand
limit
sequence
proportional
signal
or discrete
switches
The CEM board is located
in the main control box. See
Fig. 29. The inputs and outputs are sulmnarized
in Table 119.
INTEGRATED
GAS CONTROL
(IGC) -- One IGC is pro-
vided with each bank of gas heat exchangers
(2 used on the size
020-050
units and 3 on size 051 and 060 units).
The IGC
controls
the direct
spark ignition
system
and monitors
the
rollout
switch, limit switches,
and induced-draft
motor Hall
Effect
switch.
The IGC is equipped
with
an LED
(light-
emitting diode) for diagnostics.
See Table 120.
COMPRESSOR
PROTECTION
BOARD (CS) -- This board
monitors
the status of the compressor
by sensing the current
flow to the compressors
and then provides
digital stares signal
to the MBB.
101

Hide quick links: