Enable Routing For The Switch - NETGEAR GSM7252PS - ProSafe 52 Ports Gigabit Ethernet L2 Managed Stackable Switch Software Administration Manual

7000 series managed switch administration guide for software version 8.0.3
Hide thumbs Also See for GSM7252PS - ProSafe 52 Ports Gigabit Ethernet L2 Managed Stackable Switch:
Table of Contents

Advertisement

ProSafe 7000 Managed Switch Software Administration Manual, Release 8.0.3
The configuration commands used in the following example enable RIP on ports 1/0/2 and 1/0/3 as shown in
the network illustrated in
Port 1/0/2
192.150.2.2
Subnet 2
Figure 5-1

Enable Routing for the Switch

The example is shown as CLI commands and as a Web interface procedure.
CLI: Enabling Routing for the Switch
The following sequence enables routing for the switch:
(Netgear Switch) #config
(Netgear Switch) (Config)#ip routing
(Netgear Switch) (Config)#exit
Web Configuration: Enabling Routing for the Switch
To use the Web interface to configure the managed switch, proceed as follows:
Routing Information Protocol
Figure 5-1
Layer 3 Switch
acting as a router
Subnet 3
v1.0, June 2010
Port 1/0/5
192.64.4.1
Port 1/0/3
192.130.3.1
Subnet 5
5-2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Prosafe 7000

Table of Contents