IBM 4975 02L Maintenance Information page 72

Table of Contents

Advertisement

3302 Carrier Support Shaft
Removal
1.
Switch off the printer power.
2.
Remove the top cover (3052).
3.
Place the printer in the service position (3053).
4.
Remove the print emitter (3251).
5.
Loosen the screws
G
in each end of the carrier
main shaft.
6.
Remove the screws" from each end of the carri-
er support shaft.
7 .
Pull the side frames apart enough to release the
support shaft; remove the shaft.
Carrier mai n shaft
3-50
SY34-0613
Reinstallation
1.
Reinstall the carrier support shaft and tighten the
screws • .
2.
Tighten the screws
G
in each end· of the carrier
main shaft.
3.
Reinstall the print emitter (3251).
4.
Perform the carrier main shaft adjustment (3301).
5.
Perform the print-emitter to pickup adjustment
(3253) and carrier support shaft adjustment.
6.
Assemble the printer to the printer base (3053).
7.
Reinstall the top cover (3052).
-e

Advertisement

Table of Contents
loading

This manual is also suitable for:

4975 02r

Table of Contents