4
Basic Operation
Setting Up and Running a Worklist
Setting Up and Running a Worklist
1 Click Worklist to show the Worklist window.
2 Click Add Multiple Samples
Note: Samples can also be added one-by-one (user only needs to run a few
samples, or several replicates of the same sample).
3 Enter all the information on the Sample Information tab.
81
. The Add Multiple Samples dialog box opens.
Agilent Triple Quadrupole LC/MS System User Guide