Preparing The Cutting Units - Toro Reelmaster 5010-H Operator's Manual

Traction unit
Hide thumbs Also See for Reelmaster 5010-H:
Table of Contents

Advertisement

Preparing the Machine (continued)
Retain the cap for later installation.

Preparing the Cutting Units

1. Remove the cutting units from the cartons.
Assemble and adjust them as described in the
cutting unit Operator's Manual.
2. Install the counterweight
end of the cutting unit as shown.
3. Grease the carrier-frame shaft
4. Repeat this procedure for the other cutting
units.
Setup: Installing the Cutting Units
IMPORTANT
G437958
to the appropriate
.
Page 3–3
G402693
G402694
3464-478 A

Advertisement

Table of Contents
loading

This manual is also suitable for:

03950

Table of Contents