Mounting procedure

4
4 Mounting procedure
36 | 248
Building Technologies
Fire Safety
The following mounting processes are described in the following chapters:
Mounting of rear panel
Fitting all components
Assembly of the stations
Prerequisites
All parts have been checked to make sure they are complete and intact.
Mains connection is current-free
Mounting steps
The mounting procedure described is basically an ideal procedure but does not
have to be adhered to exactly.
WARNING
Electrical voltage
Mortal danger due to electric shock
Before working on the station check that the cable is disconnected from the
mains supply.
Check to make sure that the mains is secured against inadvertently being
switched on.
The components must be installed by an expert.
NOTICE
Damage to hardware
Undertake all mechanical work before installing the station and fitting the
components.
Do not connect up the batteries after installation but wait until commissioning.
1. Mount the rear panel.
2. Install the options in the rear panel.
3. Mount options on the operating unit.
4. Secure the operating unit and the operating add-on (if available) on the hinge
of the rear panel and wire this up.
5. Fit the batteries (do not connect).
6. Insert the inscription strips into the operating unit or the operating add-on.
7. Screw the operating unit or the operating add-on to the wall.
8. Fit the cover(s) and screw into place.
9. Finally the type plate must be mounted on the outside of the control panel
housing so that it is clearly visible (provision EN 54-2). The installation number
(No.:) and the date of commissioning (Date:) must be completed upon
commissioning.
a The station is then ready for commissioning.