Siemens FS720 Mounting & Installation page 223

Fire detection system
Table of Contents

Advertisement

Building Technologies
Fire Safety
1. Mount the operating add-on FCM7221-H3 (5) on the Eco housing (2) or on any
housing.
2. If the power supply is integrated, install power supply (3) in the Eco
housing (2).
3. Depending on the number of zones, mount 1 or 2 EVAC-NL connector boards
FTI2002-N1 (1, 4) with spacer bolts in the housing (2).
4. Wire up the power supply, connector boards and the operating add-on
according to the following pin assignments.
5. Check the address settings on the EVAC-NL operating units FTO2007-N1 with
the following address setting.
6. Swivel the operating add-on (5) on to the housing (2), secure it, and fit the
cover cap (for Eco housing).
Installing, exchanging and connecting modules
Remote EVAC-NL and EVAC-NL mimic display driver
7
223 | 248
A6V10210390_m_en_--
2018-08-29

Advertisement

Table of Contents
loading

Table of Contents