About This Document - Siemens FS720 Mounting & Installation

Fire detection system
Table of Contents

Advertisement

1 About this document

Target group
System owner
Installation personnel
Commissioning personnel
Maintenance personnel
Building Technologies
Fire Safety
Goal and purpose
This document describes the installation process for the stations and components
of the fire detection system. It especially provides information on the following:
Mounting of the stations
Mounting of the individual components
Assembly of the stations
This document contains instructions only with respect to mounting and
deinstallation procedures.
Document A6V10210355, Description, contains an overview of the structure and
operating principle of the fire detection system. The description also provides an
overview of the structure of the documentation.
Scope
The information contained in this document is valid for introduction package IP7.
The document also contains information on country-specific components. Country-
specific components are marked with square brackets, e.g. [DE]. It may be the
case that these cannot be used in your country.
Target groups
The information in this document is intended for the following target groups:
Activity
According to EN 50110-1,
'nominated person with the overall
responsibility to ensure the safe
operation of the electrical
installation by setting rules and
organisation or framework.'
Assembles and installs the product
components at the place of
installation.
Carries out a function check
following installation.
Configures the product at the place
of installation according to
customer-specific requirements.
Checks the product operability and
releases the product for use by the
operator.
Searches for and corrects
malfunctions.
Carries out all maintenance work.
Checks that the products are in
perfect working order.
Searches for and corrects
malfunctions.
About this document
Applicable documents
Qualification
'This person can be the owner,
employer, proprietor or a delegated
person.'
'Some of these duties can be
delegated to others as required. For
large or complex electrical
installations or networks, the duties
can be delegated for parts of the
installations or the network.'
Has received specialist training in
the area of building installation
technology or electrical installations.
Has obtained suitable specialist
training for the function and for the
products.
Has attended the training courses
for commissioning personnel.
Has obtained suitable specialist
training for the function and for the
products.
A6V10210390_m_en_--
1
7 | 248
2018-08-29

Advertisement

Table of Contents
loading

Table of Contents