Parameter
REGENERATION
00:00:00
TIME
to 23:59:59
CYCLE 1
04:00:00
CYCLE 2
to 04:00:00
CYCLE 3
to 04:00:00
CYCLE 4
to 04:00:00
CYCLE 5
to 04:00:00
AUXILIARY
RELAY
Disabled
AUX RELAY
00:00:00
OUTPUT START
to 18:00:00
AUX RELAY
00:00:00
OUTPUT END
to 18:00:00
CHEMICAL
PUMP
Disabled
Ref. MKT-IM-010 / F - 16.01.2023
Options
Definition
02:00 AM (default)
OFF to
00:10:00 (default)
OFF
01:00:00 (default)
OFF
00:10:00 (default)
OFF
00:12:00 (default)
OFF
OFF (default)
Enabled
(Default)
Enabled
(Default)
Installer manual Fleck 3150 NXT/NXT2 - Programming
Hour
Regeneration time will not appear
unless regeneration day override is on
or vale is programmed as time clock
or meter delayed.
Use the SHIFT button to move to the
left.
Use the SHIFT button to move to the
left.
This screen will only display when
cycle 4 is not OFF.
Use the SHIFT button to move to the
left.
-
Not compatible with chemical pump
activation.
Use the SHIFT button to move to the
left.
Hour
Only displayed if auxiliary relay is
enabled in previous screen.
Auxiliary relay will only display if
chemical pump is OFF for system
types 6 & 7.
Use the SHIFT button to move to the
left.
-
This screen will only display if valve is
programmed volumetric.
Not compatible with auxiliary relay
activation.
For system types 6 & 7, this screen
will only display on the lead (#1) unit if
auxiliary relay is OFF.
For all other system type, it will
display for all units.
Note