Preparing The Hardware - Agilent Technologies E7474A Getting Started Manual

Drive test wireless solutions
Hide thumbs Also See for E7474A:
Table of Contents

Advertisement

Figure 4-1 System Measurement Verification Setup Using a Signal Generator

Preparing the Hardware

Verifying the System
Method 1: Using a Signal Generator
Do This
1 Connect the system as shown in
but do not connect the signal generator
output.
The Agilent receiver requires a 30 minute
warm-up period to meet the guaranteed
specifications.
2 Depending on your system type, set the
frequency/power levels using
page
140.
3 Check that the correct values are set on the
signal generator.
138
Additional Information
Figure
4-1,
There is a three minute delay after power-up or
re-configuration, before the internal temperature
sensor is activated and measurements are
nominally correct.
For more information on how to connect the
receiver and laptop, refer to step 1 and step 2 of
any of the procedures listed in
System Setup" on page 28
Table 4-1 on
Do not connect the signal generator at this
stage.