4.6

UNPACKING

Move the equipment in it's original packing, carton box or wooden case, until the place of installation
and remove the packing and the transport sockets only just before installing the UPS.
Be aware of the heavy weight of the UPS, pay attention when moving the UPS cabinet.
White colour
Red colour
Fig. 4.6-1 ShockWatch device
Fig. 4.6-2 TiltWatch device
NOTE !
Be aware of the heavy weight of the UPS, pay attention when moving the UPS
cabinet.
Take care not to damage the UPS when moving by forklift.
A damaged UPS must never be installed or connected to Utility or Battery!
In case of any damage sustained during the transport, immediately inform the
shipping agent!
A detailed report of the damage is necessary for any indemnity claim.
Included in the delivery you can find the following parts:
• An accessories bag.
• Air inlet grids, which must be mounted on the bottom of the cabinet UPS with the screws included.
• Control Bus cables for inter-connecting the UPS modules (only For the RPA system).
• The documentation includes the "Installation Guide & User Manual" and the "UPS Safety Rules".
PACKING MATERIAL RECYCLING
GE, in compliance with environment protection, use only environmentally
friendly material.
UPS packing materials must be recycled in compliance with all applicable
regulations.
Modifications reserved
GE_UPS_ISG_TLE_SUL_M16_M50_2bU_V010.docx
Critical Power
=
without any anomaly
=
anomaly evidence
The package of the TLE Series 160 - 500 is
equipped with ShockWatch (indicator for
shock), and TiltWatch (indicator for
overthrow) on the outside.
These devices indicate an eventual shock
or overthrow during transport.
Whenever
these
devices
possible anomaly, the UPS shall not be
commissioned.
Please
contact
your
Center".
Installation Guide TLE Series 160 - 500 UL S2B
show
a
"GE
Service
Page 22/60