GE FGC TLE Series Manual page 410

40-150 kva/kw, 480 vac three phase highly efficient and scalable
Table of Contents

Advertisement

NOTE !
To operationalize this function, in case that the UPS was provided with one or
more cards "P4 - Customer Interface" (max. 3 - see Chapter 5), there must be on
each card the following:
- Remove the cable short-circuiting terminals X2 / 1, 2 (see Fig. 4.11-3).
- Remove the Jumper JP2 (see Fig. 4.11-3).
8
7
5
6
4
2
3
1
18
19
16
17
15
13
14
12
Fig. 4.11-3 X2 terminal block and Jumper JP2 on the P4 – Customer Interface Board
When the "EPO - Emergency Power Off" has been activated, the system must be restored as
follows:
Realize the push-button "EPO - Emergency Power Off" (contact on XA / EPO-1, EPO-2 is closed
again).
Perform the "Inverter OFF" command from the screen:
Commands 1 / Inverter / OFF.
(see User Manual to Section 6.5).
In case of a Parallel System perform the "Inverter OFF" command from the
screen: "Commands 1 / Inverter / OFF" of each unit connected on the Parallel
Bus and having its output switch Q1 closed.
Modifications reserved
GE_UPS_ISG_TLE_SUL_M62_1M0_2US_V010.docx
10
11
9
21
22
20
X2
Critical Power
X1
X2
J1
JP2
Installation Guide TLE Series 625 - 750 - 1000 UL S2
X1
X2
J1
Page 62/69